Page 155 - NDMC COVER FINALVol II
P. 155

ctV 2017-18                                                                                                                                                                                               BUDGET 2017-18
     fooj.k XIII                                                                                                                                                                                                            ST-XIII

i`"B 534                 SCHEDULE OF RATES OF TAXES/ ELECTRICITY & WATER TARIFF/ USER CHARGES ETC.

                    3    Small Industrial Power (SIP)4         COMMERCIAL DEPARTMENT                                                                        695 Paise/kVAh
                    4    Public Lighting
                   4.1   Metered                                                                      50`/kW/month                                           730 Paise/kWh
                   a)    Street Lighting5                                                                                                                    730 Paise/kWh
                   b)    Signals and Blinkers                                                       150`/kVA/month7
                   4.2   Unmetered                                                                  125`/kVA/month                                           780 Paise/kWh
                   a)    Street Lighting5                                                        500 `/month/hoarding                                        780 Paise/kWh
                   b)    Singals and Blinkers                                                                                                              680 Paise/kVAh3
                    5    Railway Traction6                                            50% of the relevant category other than
                    6                                                                                    Domestic                                          610 Paise/kVAh3
                   6.1   Delhi Metro Rail Corporation (DMRC)3                                                                                              1120 Paise/kVAh
                         DMRC (Supply 220kV and 66kV)                                      Same as that of relevant category
                    7                                                                                                                     Higher by 30% (Temporary Surcharge) of the
                    8    Advertisements and Hoardings                                                                                          relevant category other than Domestic
                   8.1
                  8.1.1  Temporary Supply                                                                                                 Higher by 30% (Temporary Surcharge) of the
                         For a total period of                                                                                                             relevant category
                  8.1.2  Less than 16 days
                                                                                                                                         Same as Domestic Category without Temporary
                   8.2   More than or equal to 16 days                                                                                                          Surcharge

                   8.3   For Residential Cooperative Group Housing connections and other      Same as that of relevant category without  Same as Domestic Category without Temporary
                         Residential connections                                                          Temporary Surcharge                                   Surcharge
                   8.4
                         For religious functions of traditional and established and cultural           Same as Domestic category          Higher by 30% (Temporary Surcharge) of the
                         Activities                                                                                                                        relevant category
                         For Construction projects                                                 Same as that of relevant category

                  Notes on Superscripts

                           1 For all categories other than Domestic, Fixed/demand charges are to be levied on billing demand on per kW/kVA or part thereof, basis. Where the MDI reading exceeds
                                      sanctioned load/contract demand, a surcharge of 30% shall be levied on the fixed charges corresponding to excess load in kW/kVA for such billing cycle only.
                                      Whereever, sanctioned load/ contract demand is in kW/HP, the kVA shall be calculated on basis of actual power factor of the consumer, for the relevant billing cycle.

                           2 Time of Day (TOD) Tariff #
                                    a TOD tariff shall be applicable on all consumers (other than domestic) whose sanctioned load/MDI (whichever is higher) is 25kW/27kVA and above as shown in the table
                                      below.
                                    b Option of ToD Tariff shall be available for all consumers (other than domestic) Whose sanctioned load/MDI (whichever is higher) is 11kW/12kVA to 25kW/27kVA, if
                                      the consumer who has opted for ToD of sanctioned load between 11kW/12kVA to 25kW/27kVA, the charges for up-gradation of meters, if any, shall be borne by
                                      respective consumers.
                                    c The Commission has decided to reduce the Rebate during the Off Peak hours from 25% to 20%, whereas for Peak hours Surcharge shall continue at 20% Optional ToD
                                      Consumers will have the option to move back to non-ToD regime only once within one Financial Year.
                                    d Further, the Commission has reviewed the latest available Demand and Supply of Delhi and has revised the time slots for Peak and Off-Peak hours as follows:

                                                                                                                                                                                                             pageĀ 534
   150   151   152   153   154   155   156   157   158   159   160