SCHEDULE OF RATES OF TAXES/ ELECTRICITY & WATER TARIFF/ USER CHARGES ETC.
3 Small Industrial Power (SIP) 4 COMMERCIAL DEPARTMENT `7.90/kVAh
4 Public Lighting `100/kVA/month
4.1 Metered
a ) Street Lighting5 `150/kVA/month `7.30/kWh
b ) Signals and Blinkers `7.30/kWh
4.2 Unmetered `130/kVA/month
a ) Street Lighting5 `600/month/hoarding `7.80/kWh
b ) Singals and Blinkers `7.80/kWh
`6.80/kVAh
5 Railway Traction 6
`6.10/kVAh
6 Delhi Metro Rail Corporation (DMRC) 3 `11.20/kVAh
6.1 DMRC
7 Advertisements and Hoardings
8 Temporary Supply
8.1 Domestic Connections inculding Group Housing Same rate as that of relevant category Same as that of relevant category without any temporary surcharge
Societies Flat rate of `5,400 per month
Elelctricty tax of MCD: `270 per
8.2 For threshers during the threshing season connection per month
8.3 All other connections including consturction projects Same rate as that of relevant category 1.30 times of the relevant category of tariff
9 Charging Stations for E-RICKSHAW/ E-VEHICLE on `5.50/kWh
Single Delivery `5.00/kWh
9.1 Supply at LT
9.2 Supply at HT
Notes:- For all categories other than Domestic, Fixed charges are to be levied based on billing demand per kW/kVA or part thereof. Where the Maximum Demand (MD), as defined in
1 DERC (Supply Code and Performance Standards) Regulations, 2017, reading exceeds sanctioned load/contract demand, a surcharge of 30% shall be levied on the fixed charges
corresponding to excess load in kW/kVA for such billing cycle only. Wherever, sanctioned load/ contract demand is in kW/HP, the kVA shall be calculated on basis of actual power
2 factor of the consumer, for the relevant billing cycle.
Time of Day (TOD) Tariff
a TOD tariff shall be applicable on all consumers (other than domestic) whose sanctioned load/MDI (whichever is higher) is 25kW/27kVA and above as shown in the table.
b Option of ToD Tariff shall also be available for all consumers (other than domestic) whose sanctioned load/MDI (whichever is higher) is 11kW/12kVA to 25kW/27kVA. If the
consumer who has opted for TOD of sanctioned load between 11kW/12kVA to 25kW/27kVA, the charges for up-gradation of meters, if any, shall be borne by respective
consumers.
c The Commission has decided to retain the Rebate during the Off Peak hours and Peak hours Surcharge shall continue at 20% Optional TOD Consumers will have the option to
move back to Non-TOD regime only once within one Financial Year.
d For other than Peak and Off-Peak hours normal Energy Charges shall be applicable.
e Further, the Commission has reviewed the latest available Demand and Supply of Delhi and has revised the time slots for Peak and Off-Peak hours as follows: